Assess risks before implementing the solution.
Evaluate failure modes, effects and current controls. Identify priority risks to build your test and validation plan.
FMEA and validation for a glass panel connectionIllustrative projectKEIP · GlassGlass panel requirements and FMEA notes · Example
Sample dialogue · Not a live analysis. The authorized team makes the final decision. Animations and visual styling are illustrative.
What can you evaluate?
- A solution of your choice
- A technical concept
- Test results
- Requirements and constraints
- Alternatives you want to compare
How are risks prioritized?
Identifies risks, groups them by importance, highlights missing evidence and structures verification work.
Failure mode → Effect → Control
Evaluate severity, occurrence and detection scores with supporting rationale.
Priority → Action → Test
RPN and, when needed, AP assessment based on the method table support engineering review.
Acceptance criterion → Engineer approval
Keep the risk open rather than closing it if test evidence is insufficient.
What do you get before the decision?
- Prioritized risks
- Assumptions that need testing
- Success and acceptance criteria
- Validation plan
- Pre-decision checklist
Drafts ready for engineer review
Verify evidence, missing information and acceptance criteria with your team. The final decision and approval remain with you.
